Panoramic view of Ferrari, Lamborghini and Maserati vehicles in the GTE Engineering workshop with gray tile flooring

Getrag 7DCL750 Rebuild: Stage 1 and Additional Work

Stage 1 is teardown and inspection

GTE Engineering's Stage 1 service for the Getrag 7DCL750 covers teardown and inspection. It is the assessment stage, not a complete rebuild including all replacement parts. The findings establish the additional work needed for the submitted transmission.

Parts and electronics are additional

Additional requirements may include speed sensors, clutch speed sensors, electrovalves, gears, seals, pumps, pressure sensors and gaskets. Refurbishment of the SAP and CCP hydraulic units is also additional. The applicable quotation should identify the work and parts required; not every transmission needs the same repair.

Provide diagnostic information

Include the transmission identification, fault codes and a clear description of the symptoms. Record when the fault occurs and any recent repairs. A code or symptom alone does not prove that a particular internal part is defective.

Before shipping

Confirm the required components, paperwork and transport arrangements before dispatch. Follow the shipping instructions for preparation and secure packaging. A shipment tracking update reports transport progress, not completion of a transmission rebuild.

After inspection

Review the findings and proposed scope before additional work proceeds. Installation, fluid specification and any required setup remain application-specific.

Resources and service information

Related reading

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.